Neotel Planned Change scheduled at NSN POP on the 11th February 2017 from 06:00 to 12:00 (GMT: +02:00).

Dear Valued Clients,


Please note that we have Neotel Planned Change scheduled at  NSN POP on the 11th February 2017  from 06:00 to 12:00 (GMT: +02:00). We need to do permanent repairs on a damaged fibre cable at NSN POP.

 

 

Services will be hard down for a maximum duration of 4hours during this change.

 

 

Reason for Change:

 

 

To do permanent repairs on a damaged fibre cable at NSN POP.

 

 

Implementation plan

 

 

· Technicians will install  new cable from end to end.

· Cables will be prepared after into new fibre joints.

· All fibres will be tested to confirm quality use.

· Technicians will cut the old cable and prepare it into the new joint.

· Technicians will splice the cable as per service priority.

· Continuously confirming with both IP and SDH NOC for service restoration.

· Technicians will splice the rest of the fibres once all workers are through.

· Final confirmation with both NOC on completion.

 

Rollback Plan:

 

 

· System(s) will be cut on new cable as per priority and service affecting.

· OSP will continuously confirm during and after the cut over with both IP and SDH NOC.

· Should there be any system which is still down after the planned work execution, then it will be treated as fault.

· Fibre fault diagnose process will kick in to restore the affected services.

· End to end test will be done to check fibre conditions.

· The test will be performed between the applicable POP and the jointing site.

· OSP FST will ensure that all links are up before parting site.